TELLURIDE HIGH SCHOOL
Client:
Telluride High School
Location:
Telluride, CO
Products:
MG 250

Summary
Sunsense Solar partnered with Yearout Energy Services, Current Energy Storage, and ELM MicroGrid to design, procure, and construct a 372kW solar electric power system alongside a 550kWh ELM MicroGrid energy storage solution for the Telluride High School campus in Telluride, Colorado. This installation provides renewable energy generation and robust backup power for the entire campus.
The project was part of a broader district-wide initiative to implement energy efficiency improvements across multiple buildings. In collaboration with a team of subcontractors, lighting upgrades and weatherization measures were carried out, while Sunsense Solar focused on delivering the photovoltaic (PV) system, energy storage solutions, and electric vehicle (EV) charging stations.
Telluride’s high-altitude, sunny climate makes it ideal for solar energy, allowing the PV system to regularly surpass energy production forecasts. Given the town’s remote location, nestled in a box canyon with just one road in and out, adding energy storage was critical for both peak demand management and emergency backup power. The school, designated as an emergency shelter, can now provide power in the event of snowstorms, rockslides, wildfires, or other natural disruptions.
The project was supported by the Colorado Department of Local Affairs (DOLA) and the San Miguel Power Association, the local cooperative utility. Additional backing came from the Town of Telluride and its residents, ensuring strong community involvement throughout the process.
Completion Date: December 2023